ANALISA HARGA SATUAN, pekerjaan dinding bag 2

1 m2 Pasangan Dinding Con block (CB. 15)

BAHAN

Concrete block (CB.15)

12.500

Bh

x Rp.

= Rp.

-

Semen Portland

10.460

Kg

x Rp.

= Rp.

-

Pasir Beton

0.003

M3

x Rp.

= Rp.

-

Pasir Pasang

0.032

M3

x Rp.

= Rp.

-

Besi Beton Polos Dia. 8 mm

0.870

Kg

x Rp.

= Rp.

-

Paku Biasa 2" - 5"

0.004

Kg

x Rp.

= Rp.

-

Kayu Terentang

0.001

Kg

x Rp.

= Rp.

-

Kawat Beton

0.020

Kg

x Rp.

= Rp.

-

Koral Beton

0.004

Kg

x Rp.

= Rp.

-

Jumlah 1

= Rp.

-

TENAGA

Pekerja

0.340

OH

x Rp.

= Rp.

-

Tukang Batu

0.130

OH

x Rp.

= Rp.

-

Tukang Besi

0.007

OH

x Rp.

= Rp.

-

Kepala Tukang

0.0137

OH

x Rp.

= Rp.

-

Mandor

0.017

OH

x Rp.

= Rp.

-

Jumlah 2

= Rp.

-

Jumlah (1) + (2)

= Rp.

-

1 m2 Pasangan Dinding Con block (CB. 15)

BAHAN

Concrete block (CB.10)

12.500

Bh

x Rp.

= Rp.

-

Semen Portland

7.200

Kg

x Rp.

= Rp.

-

Pasir Beton

0.002

M3

x Rp.

= Rp.

-

Pasir Pasang

0.021

M3

x Rp.

= Rp.

-

Besi Beton Polos

2.540

Kg

x Rp.

= Rp.

-

Paku Biasa 2" - 5"

0.003

Kg

x Rp.

= Rp.

-

Kayu Terentang

0.001

Kg

x Rp.

= Rp.

-

Kawat Beton

0.015

Kg

x Rp.

= Rp.

-

Koral Beton

0.003

Kg

x Rp.

= Rp.

-

Jumlah 1

= Rp.

-

TENAGA

Pekerja

0.340

OH

x Rp.

= Rp.

-

Tukang Batu

0.107

OH

x Rp.

= Rp.

-

Tukang Besi

0.007

OH

x Rp.

= Rp.

-

Kepala Tukang

0.0114

OH

x Rp.

= Rp.

-

Mandor

0.017

OH

x Rp.

= Rp.

-

Jumlah 2

= Rp.

-

Jumlah (1) + (2)

= Rp.

-

1 m2 Pasangan Dinding Latai

BAHAN

Bond Beam 40x40x20 cm

2.500

Bh

x Rp.

= Rp.

-

Semen Portland

5.100

Kg

x Rp.

= Rp.

-

Pasir Beton

0.080

M3

x Rp.

= Rp.

-

Besi Beton Polos

1.500

Kg

x Rp.

= Rp.

-

Koral Beton

0.150

Kg

x Rp.

= Rp.

-

Jumlah 1

= Rp.

-

TENAGA

Pekerja

0.100

OH

x Rp.

= Rp.

-

Tukang Batu

0.030

OH

x Rp.

= Rp.

-

Tukang Besi

0.030

OH

x Rp.

= Rp.

-

Kepala Tukang

0.006

OH

x Rp.

= Rp.

-

Mandor

0.005

OH

x Rp.

= Rp.

-

Jumlah 2

= Rp.

-

Jumlah (1) + (2)

= Rp.

-

1 m2 Pasangan Dinding Roster/Terawang (12 x 11 x 24) cm

BAHAN

Roster/Terawang

36.000

Bh

x Rp.

= Rp.

-

Semen Portland

12.800

Kg

x Rp.

= Rp.

-

Pasir Pasang

0.035

M3

x Rp.

= Rp.

-

Jumlah 1

= Rp.

-

TENAGA

Pekerja

0.300

OH

x Rp.

= Rp.

-

Tukang Batu

0.100

OH

x Rp.

= Rp.

-

Kepala Tukang

0.010

OH

x Rp.

= Rp.

-

Mandor

0.015

OH

x Rp.

= Rp.

-

Jumlah 2

= Rp.

-

Jumlah (1) + (2)

= Rp.

-

1 m2 Pasangan Bata Berongga Ukuran (5 x 11 x 24) cm

BAHAN

Bata Berongga

80.000

Bh

x Rp.

= Rp.

-

Semen Portland

23.650

Kg

x Rp.

= Rp.

-

Pasir Pasang

0.570

M3

x Rp.

= Rp.

-

Jumlah 1

= Rp.

-

TENAGA

Pekerja

0.320

OH

x Rp.

= Rp.

-

Tukang Batu

0.150

OH

x Rp.

= Rp.

-

Kepala Tukang

0.015

OH

x Rp.

= Rp.

-

Mandor

0.015

OH

x Rp.

= Rp.

-

Jumlah 2

= Rp.

-

Jumlah (1) + (2)

= Rp.

-

1 m2 Pasangan Dinding Anyaman Bambu, Rangka Kayu

BAHAN

Bilik Bambu

1.500

M2

x Rp.

= Rp.

-

Kayu 5/7

0.014

M3

x Rp.

= Rp.

-

Paku

0.012

Kg

x Rp.

= Rp.

-

List Kayu 2/4

0.003

M3

x Rp.

= Rp.

-

Jumlah 1

= Rp.

-

TENAGA

Pekerja

0.100

OH

x Rp.

= Rp.

-

Tukang Batu

0.050

OH

x Rp.

= Rp.

-

Kepala Tukang

0.005

OH

x Rp.

= Rp.

-

Mandor

0.002

OH

x Rp.

= Rp.

-

Jumlah 2

= Rp.

-

Jumlah (1) + (2)

= Rp.

-