ANALISA HARGA SATUAN, pekerjaan dinding bag 4

1 m2 Pasangan Batu Merah Tebal 1/2 Bata, 1 Kp : 1 SM : 2 Ps

BAHAN

Batu Merah 5 x 11 x 22 cm

70.000

Bh

x Rp.

= Rp.

-

Semen Merah

0.014

Kg

x Rp.

= Rp.

-

Pasir Pasang

0.028

M3

x Rp.

= Rp.

-

Kapur Padam

0.014

M3

x Rp.

= Rp.

-

Jumlah 1

= Rp.

-

TENAGA

Pekerja

0.320

OH

x Rp.

= Rp.

-

Tukang Batu

0.100

OH

x Rp.

= Rp.

-

Kepala Tukang

0.010

OH

x Rp.

= Rp.

-

Mandor

0.015

OH

x Rp.

= Rp.

-

Jumlah 2

= Rp.

-

Jumlah (1) + (2)

= Rp.

-

1 m2 Pasangan Dinding Hollow block (HB. 20)

BAHAN

Hollow block (HB.20)

12.500

Bh

x Rp.

= Rp.

-

Semen Portland

13.500

Kg

x Rp.

= Rp.

-

Pasir Pasang

0.048

M3

x Rp.

= Rp.

-

Besi Beton Polos

1.950

Kg

x Rp.

= Rp.

-

Jumlah 1

= Rp.

-

TENAGA

Pekerja

0.350

OH

x Rp.

= Rp.

-

Tukang Batu

0.150

OH

x Rp.

= Rp.

-

Kepala Tukang

0.015

OH

x Rp.

= Rp.

-

Mandor

0.017

OH

x Rp.

= Rp.

-

Jumlah 2

= Rp.

-

Jumlah (1) + (2)

= Rp.

-

1 m2 Pasangan Dinding Hollow block (HB. 15)

BAHAN

Hollow block (HB.15)

12.500

Bh

x Rp.

= Rp.

-

Semen Portland

10.450

Kg

x Rp.

= Rp.

-

Pasir Pasang

0.038

M3

x Rp.

= Rp.

-

Besi Beton Polos

1.950

Kg

x Rp.

= Rp.

-

Jumlah 1

= Rp.

-

TENAGA

Pekerja

0.320

OH

x Rp.

= Rp.

-

Tukang Batu

0.120

OH

x Rp.

= Rp.

-

Kepala Tukang

0.012

OH

x Rp.

= Rp.

-

Mandor

0.015

OH

x Rp.

= Rp.

-

Jumlah 2

= Rp.

-

Jumlah (1) + (2)

= Rp.

-

1 m2 Pasangan Dinding Hollow block (HB. 10)

BAHAN

Hollow block (HB.10)

12.500

Bh

x Rp.

= Rp.

-

Semen Portland

7.500

Kg

x Rp.

= Rp.

-

Pasir Pasang

0.027

M3

x Rp.

= Rp.

-

Besi Beton Polos

1.950

Kg

x Rp.

= Rp.

-

Jumlah 1

= Rp.

-

TENAGA

Pekerja

0.320

OH

x Rp.

= Rp.

-

Tukang Batu

0.100

OH

x Rp.

= Rp.

-

Kepala Tukang

0.010

OH

x Rp.

= Rp.

-

Mandor

0.015

OH

x Rp.

= Rp.

-

Jumlah 2

= Rp.

-

Jumlah (1) + (2)

= Rp.

-

1 m2 Pasangan Dinding Con block (CB. 20)

BAHAN

Concrete block (CB.20)

12.500

Bh

x Rp.

= Rp.

-

Semen Portland

14.050

Kg

x Rp.

= Rp.

-

Pasir Beton

0.004

M3

x Rp.

= Rp.

-

Pasir Pasang

0.042

M3

x Rp.

= Rp.

-

Besi Beton Polos

3.870

Kg

x Rp.

= Rp.

-

Paku Biasa 2" - 5"

0.006

Kg

x Rp.

= Rp.

-

Kayu Terentang

0.001

Kg

x Rp.

= Rp.

-

Kawat Beton

0.030

Kg

x Rp.

= Rp.

-

Koral Beton

0.005

Kg

x Rp.

= Rp.

-

Jumlah 1

= Rp.

-

TENAGA

Pekerja

0.370

OH

x Rp.

= Rp.

-

Tukang Batu

0.157

OH

x Rp.

= Rp.

-

Tukang Besi

0.007

OH

x Rp.

= Rp.

-

Kepala Tukang

0.0164

OH

x Rp.

= Rp.

-

Mandor

0.0185

OH

x Rp.

= Rp.

-

Jumlah 2

= Rp.

-

Jumlah (1) + (2)

= Rp.

-