1 m2 | Plesteran 1 Pc : 5 Ps, Tebal 30 mm | |||||
BAHAN | | | | | | |
Semen Portland | | | 8.190 | Kg | x Rp. | |
Pasir Pasang | | | 0.045 | M3 | x Rp. | |
| | | | | Jumlah 1 | |
| | | | | | |
TENAGA | | | | | | |
Pekerja | | | 0.320 | OH | x Rp. | |
Tukang Batu | | | 0.250 | OH | x Rp. | |
Kepala Tukang | | | 0.025 | OH | x Rp. | |
Mandor | | | 0.015 | OH | x Rp. | |
| | | | | Jumlah 2 | |
| | | | | Jumlah (1) + (2) | |
| | | | | | |
1 m2 | Berapen 1 Pc : 3 Ps, Tebal 30 mm | |||||
BAHAN | | | | | | |
Semen Portland | | | 7.070 | Kg | x Rp. | |
Pasir Pasang | | | 0.021 | M3 | x Rp. | |
| | | | | Jumlah 1 | |
| | | | | | |
TENAGA | | | | | | |
Pekerja | | | 0.150 | OH | x Rp. | |
Tukang Batu | | | 0.070 | OH | x Rp. | |
Kepala Tukang | | | 0.007 | OH | x Rp. | |
Mandor | | | 0.008 | OH | x Rp. | |
| | | | | Jumlah 2 | |
| | | | | Jumlah (1) + (2) | |
| | | | | | |
| | | | | | |
1 m2 | Berapen 1 Pc : 5 Ps, Tebal 15 mm | |||||
BAHAN | | | | | | |
Semen Portland | | | 5.670 | Kg | x Rp. | |
Pasir Pasang | | | 0.023 | M3 | x Rp. | |
| | | | | Jumlah 1 | |
| | | | | | |
TENAGA | | | | | | |
Pekerja | | | 0.150 | OH | x Rp. | |
Tukang Batu | | | 0.070 | OH | x Rp. | |
Kepala Tukang | | | 0.007 | OH | x Rp. | |
Mandor | | | 0.008 | OH | x Rp. | |
| | | | | Jumlah 2 | |
| | | | | Jumlah (1) + (2) | |
| | | | | | |
1 m2 | Plesteran Beton 1 Pc : 2 Ps, Tebal 15 mm | |||||
BAHAN | | | | | | |
Semen Portland | | | 9.300 | Kg | x Rp. | |
Pasir Pasang | | | 0.018 | M3 | x Rp. | |
| | | | | Jumlah 1 | |
| | | | | | |
TENAGA | | | | | | |
Pekerja | | | 0.260 | OH | x Rp. | |
Tukang Batu | | | 0.200 | OH | x Rp. | |
Kepala Tukang | | | 0.020 | OH | x Rp. | |
Mandor | | | 0.013 | OH | x Rp. | |
| | | | | Jumlah 2 | |
| | | | | Jumlah (1) + (2) | |
| | | | | | |
1 m2 | Plesteran Beton 1 Pc : 3 Ps, Tebal 15 mm | |||||
BAHAN | | | | | | |
Semen Portland | | | 7.070 | Kg | x Rp. | |
Pasir Pasang | | | 0.021 | M3 | x Rp. | |
| | | | | Jumlah 1 | |
| | | | | | |
TENAGA | | | | | | |
Pekerja | | | 0.260 | OH | x Rp. | |
Tukang Batu | | | 0.200 | OH | x Rp. | |
Kepala Tukang | | | 0.020 | OH | x Rp. | |
Mandor | | | 0.013 | OH | x Rp. | |
| | | | | Jumlah 2 | |
| | | | | Jumlah (1) + (2) | |
| | | | | | |
1 m2 | Plesteran Skoning 1 Pc : 2 Ps | |||||
BAHAN | | | | | | |
Semen Portland | | | 0.500 | Kg | x Rp. | |
Pasir Pasang | | | 0.002 | M3 | x Rp. | |
| | | | | Jumlah 1 | |
| | | | | | |
TENAGA | | | | | | |
Pekerja | | | 0.057 | OH | x Rp. | |
Tukang Batu | | | 0.038 | OH | x Rp. | |
Kepala Tukang | | | 0.038 | OH | x Rp. | |
Mandor | | | 0.002 | OH | x Rp. | |
| | | | | Jumlah 2 | |
| | | | | Jumlah (1) + (2) | |