| 1 m2 Pembuatan Kantor Sementara dengan Lantai   Plesteran  | ||||
|  BAHAN  |   |   |   |   | 
|  Dolken Kayu Dia. 8 - 10/400 cm  |    1.250  |  Btg  |  x Rp.  |  = Rp.  | 
|  Kayu  |    0.180  |  M3  |  x Rp.  |  = Rp.  | 
|  Paku Biasa  |    0.850  |  Kg  |  x Rp.  |  = Rp.  | 
|  Besi Strip  |    1.100  |  Kg  |  x Rp.  |  = Rp.  | 
|  Semen Portland  |    35.00  |  Kg  |  x Rp.  |  = Rp.  | 
|  Pasir Pasang  |    0.150  |  M3  |  x Rp.  |  = Rp.  | 
|  Pasir Beton  |    0.100  |  M3  |  x Rp.  |  = Rp.  | 
|  Koral Beton  |    0.150  |  M3  |  x Rp.  |  = Rp.  | 
|  Bata Merah  |    30.00  |  Bh  |  x Rp.  |  = Rp.  | 
|  Seng Plat  |    0.250  |  Lbr  |  x Rp.  |  = Rp.  | 
|  Jendela Nako  |    2.000  |  Bh  |  x Rp.  |  = Rp.  | 
|  Kaca Polos  |    0.080  |  M2  |  x Rp.  |  = Rp.  | 
|  Kunci Tanam  |    0.150  |  Bh  |  x Rp.  |  = Rp.  | 
|  Plywood 4 mm  |    0.060  |  Lbr  |  x Rp.  |  = Rp.  | 
|   |   |   |  Jumlah 1  |  = Rp.  | 
|   |   |   |   |   | 
|  TENAGA  |   |   |   |   | 
|  Pekerja  |    2.000  |  OH  |  x Rp.  |  = Rp.  | 
|  Tukang Kayu  |    2.000  |  OH  |  x Rp.  |  = Rp.  | 
|  Tukang Batu  |    1.000  |  OH  |  x Rp.  |  = Rp.  | 
|  Kepala Tukang  |    0.300  |  OH  |  x Rp.  |  = Rp.  | 
|  Mandor  |    0.050  |  OH  |  x Rp.  |  = Rp.  | 
|   |   |   |  Jumlah 2  |  = Rp.  | 
|   |   |   |  Jumlah (1) + (2)  |  = Rp.  | 
|   |   |   |   |   | 
|  1 m2   Pembuatan Gudang Semen dan Alat-alat  | ||||
|  BAHAN  |   |   |   |   | 
|  Dolken Kayu Dia. 8 - 10/400 cm  |    1.700  |  Btg  |  x Rp.  |  = Rp.  | 
|  Kayu  |    0.210  |  M3  |  x Rp.  |  = Rp.  | 
|  Paku Biasa  |    0.300  |  Kg  |  x Rp.  |  = Rp.  | 
|  Semen Portland  |    10.50  |  Kg  |  x Rp.  |  = Rp.  | 
|  Pasir Beton  |    0.030  |  M3  |  x Rp.  |  = Rp.  | 
|  Koral Beton  |    0.050  |  M3  |  x Rp.  |  = Rp.  | 
|  Seng Gelombang Bjls.32  |    1.500  |  Lbr  |  x Rp.  |  = Rp.  | 
|   |   |   |  Jumlah 1  |  = Rp.  | 
|   |   |   |   |   | 
|  TENAGA  |   |   |   |   | 
|  Pekerja  |    1.000  |  OH  |  x Rp.  |  = Rp.  | 
|  Tukang Kayu  |    2.000  |  OH  |  x Rp.  |  = Rp.  | 
|  Kepala Tukang  |    0.200  |  OH  |  x Rp.  |  = Rp.  | 
|  Mandor  |    0.050  |  OH  |  x Rp.  |  = Rp.  | 
|   |   |   |  Jumlah 2  |  = Rp.  | 
|   |   |   |  Jumlah (1) + (2)  |  = Rp.  | 
|   |   |   |   |   | 
|  1 M2   Pembuatan Rumah Jaga / Konstruksi Kayu  | ||||
|  BAHAN  |   |   |   |   | 
|  Dolken Kayu Dia. 8 - 10/400 cm  |    3.000  |  Btg  |  x Rp.  |  = Rp.  | 
|  Kayu  |    0.276  |  M3  |  x Rp.  |  = Rp.  | 
|  Paku Biasa  |    0.700  |  Kg  |  x Rp.  |  = Rp.  | 
|  Seng Gelombang Bjls.32  |    1.500  |  Lbr  |  x Rp.  |  = Rp.  | 
|   |   |   |  Jumlah 1  |  = Rp.  | 
|   |   |   |   |   | 
|  TENAGA  |   |   |   |   | 
|  Pekerja  |    1.000  |  OH  |  x Rp.  |  = Rp.  | 
|  Tukang Kayu  |    1.500  |  OH  |  x Rp.  |  = Rp.  | 
|  Kepala Tukang  |    0.150  |  OH  |  x Rp.  |  = Rp.  | 
|  Mandor  |    0.050  |  OH  |  x Rp.  |  = Rp.  | 
|   |   |   |  Jumlah 2  |  = Rp.  | 
|   |   |   |  Jumlah (1) + (2)  |  = Rp.  | 
|   |   |   |   |   | 
|  1 m2   Membersihkan Lapangan dan Perataan  | ||||
|  TENAGA  |   |   |   |   | 
|  Pekerja  |    0.100  |  OH  |  x Rp.  |  = Rp.  | 
|  Mandor  |    0.050  |  OH  |  x Rp.  |  = Rp.  | 
|   |   |   |  Jumlah 1  |  = Rp.  | 
|   |   |   |   |   | 
|  1 m2   Pembuatan Bedeng Buruh  | ||||
|  BAHAN  |   |   |   |   | 
|  Dolken Kayu Dia. 8 - 10/400 cm  |    1.250  |  Btg  |  x Rp.  |  = Rp.  | 
|  Kayu  |    0.186  |  M3  |  x Rp.  |  = Rp.  | 
|  Paku Biasa  |    0.300  |  Kg  |  x Rp.  |  = Rp.  | 
|  Semen Portland  |    18.00  |  Kg  |  x Rp.  |  = Rp.  | 
|  Pasir Beton  |    0.030  |  M3  |  x Rp.  |  = Rp.  | 
|  Koral Beton  |    0.050  |  M3  |  x Rp.  |  = Rp.  | 
|  Seng Gelombang Bjls.32  |    1.500  |  Lbr  |  x Rp.  |  = Rp.  | 
|  Plywood 4 mm  |    1.350  |  Lbr  |  x Rp.  |  = Rp.  | 
|   |   |   |  Jumlah 1  |  = Rp.  | 
|   |   |   |   |   | 
|  TENAGA  |   |   |   |   | 
|  Pekerja  |    1.000  |  OH  |  x Rp.  |  = Rp.  | 
|  Tukang Kayu  |    2.000  |  OH  |  x Rp.  |  = Rp.  | 
|  Kepala Tukang  |    0.200  |  OH  |  x Rp.  |  = Rp.  | 
|  Mandor  |    0.050  |  OH  |  x Rp.  |  = Rp.  | 
|   |   |   |  Jumlah 2  |  = Rp.  | 
|   |   |   |  Jumlah (1) + (2)  |  = Rp.  | 
|   |   |   |   |   | 
|  1 m2   Pembuatan Bak Adukan Ukuran (40 x 50 x 20) cm  | ||||
|  BAHAN  |   |   |   |   | 
|  Kayu Terentang  |    0.036  |  M3  |  x Rp.  |  = Rp.  | 
|  Paku Biasa  |    0.080  |  Kg  |  x Rp.  |  = Rp.  | 
|  Kaso 5/7  |    1.000  |  Btg  |  x Rp.  |  = Rp.  | 
|   |   |   |  Jumlah 1  |  = Rp.  | 
|   |   |   |   |   | 
|  TENAGA  |   |   |   |   | 
|  Tukang Kayu  |    0.300  |  OH  |  x Rp.  |  = Rp.  | 
|  Mandor  |  0.0015  |  OH  |  x Rp.  |  = Rp.  | 
|   |   |   |  Jumlah 2  |  = Rp.  | 
|   |   |   |  Jumlah (1) + (2)  |  = Rp.  | 
|   |   |   |   |   | 
|   |   |   |   |   | 
|   |   |   |   |   | 
|   |   |   |   |   | 
|   |   |   |   |   | 
|   |   |   |   |   | 
|   |   |   |   |   | 
|  1 m2  Pembuatan Stegger dari Bambu, Ukuran (40 x   50 x 20 ) cm  | ||||
|  BAHAN  |   |   |   |   | 
|  Bambu Dia. 6 - 8/600 cm  |    1.000  |  Btg  |  x Rp.  |  = Rp.  | 
|  Tali Ijuk  |    0.250  |  Kg  |  x Rp.  |  = Rp.  | 
|   |   |   |  Jumlah 1  |  = Rp.  | 
|   |   |   |   |   | 
|  TENAGA  |   |   |   |   | 
|  Pekerja  |    0.250  |  OH  |  x Rp.  |  = Rp.  | 
|  Tukang Kayu  |    0.017  |  OH  |  x Rp.  |  = Rp.  | 
|  Kepala Tukang  |    0.002  |  OH  |  x Rp.  |  = Rp.  | 
|  Mandor  |    0.013  |  OH  |  x Rp.  |  = Rp.  | 
|   |   |   |  Jumlah 2  |  = Rp.  | 
|   |   |   |  Jumlah (1) + (2)  |  = Rp.  | 
|   |   |   |   |   | 
|  1 m2   Pembuatan Jalan Sementara  | ||||
|  BAHAN  |   |   |   |   | 
|  Batu Belah 15/20  |    0.150  |  M3  |  x Rp.  |  = Rp.  | 
|  Batu Pecah 5/7  |    0.090  |  M3  |  x Rp.  |  = Rp.  | 
|  Pasir Pasang  |    0.010  |  M3  |  x Rp.  |  = Rp.  | 
|   |   |   |  Jumlah 1  |  = Rp.  | 
|   |   |   |   |   | 
|  TENAGA  |   |   |   |   | 
|  Pekerja  |    1.000  |  OH  |  x Rp.  |  = Rp.  | 
|  Mandor  |    0.050  |  OH  |  x Rp.  |  = Rp.  | 
|   |   |   |  Jumlah 2  |  = Rp.  | 
|   |   |   |  Jumlah (1) + (2)  |  = Rp.  | 
|   |   |   |   |   | 
|  1 m3   Bongkaran Beton Bertulang  | ||||
|  TENAGA  |   |   |   |   | 
|  Pekerja  |    6.667  |  OH  |  x Rp.  |  = Rp.  | 
|  Mandor  |    0.333  |  OH  |  x Rp.  |  = Rp.  | 
|   |   |   |  Jumlah 1  |  = Rp.  | 
|   |   |   |   |   | 
|  1 m3   Bongkaran Dinding Tembok Bata Merah  | ||||
|  TENAGA  |   |   |   |   | 
|  Pekerja  |    6.667  |  OH  |  x Rp.  |  = Rp.  | 
|  Mandor  |    0.333  |  OH  |  x Rp.  |  = Rp.  | 
|   |   |   |  Jumlah 1  |  = Rp.  | 
|   |   |   |   |   | 
|  1 m'   Pasang Pagar Kawat Jaring Galvanis, Tinggi 1,00 Meter  | ||||
|  BAHAN  |   |   |   |   | 
|  Pagar Kawat Jaring  |    0.434  |  Lbr  |  x Rp.  |  = Rp.  | 
|   |   |   |  Jumlah 1  |  = Rp.  | 
|   |   |   |   |   | 
|  TENAGA  |   |   |   |   | 
|  Pekerja  |    0.042  |  OH  |  x Rp.  |  = Rp.  | 
|  Tukang     |    0.042  |  OH  |  x Rp.  |  = Rp.  | 
|  Kepala Tukang  |    0.004  |  OH  |  x Rp.  |  = Rp.  | 
|  Mandor  |    0.002  |  OH  |  x Rp.  |  = Rp.  | 
|   |   |   |  Jumlah 2  |  = Rp.  | 
|   |   |   |  Jumlah (1) + (2)  |  = Rp.  | 
|   |   |   |   |   | 
|   |   |   |   |   | 
|   |   |   |   |   | 
|   |   |   |   |   | 
|   |   |   |   |   | 
|   |   |   |   |   | 
|   |   |   |   |   | 
|   |   |   |   |   | 
|   |   |   |   |   | 
|   |   |   |   |   | 
|  1 m'   Pasang Pagar Beton Pracetak (5 x 50 x 213) cm  | ||||
|  BAHAN  |   |   |   |   | 
|  Panel Beton Pracetak  |    0.986  |  Lbr  |  x Rp.  |  = Rp.  | 
|  Kolom Beton Pracetak  |    0.525  |  Btg  |  x Rp.  |  = Rp.  | 
|  Pasir Beton  |    0.074  |  M3  |  x Rp.  |  = Rp.  | 
|  Koral 2/3  |    0.146  |  M3  |  x Rp.  |  = Rp.  | 
|  Semen Abu-abu  |  45.000  |  Kg  |  x Rp.  |  = Rp.  | 
|   |   |   |  Jumlah 1  |  = Rp.  | 
|   |   |   |   |   | 
|  TENAGA  |   |   |   |   | 
|  Pekerja  |    0.375  |  OH  |  x Rp.  |  = Rp.  | 
|  Tukang Batu  |    0.125  |  OH  |  x Rp.  |  = Rp.  | 
|  Kepala Tukang  |    0.012  |  OH  |  x Rp.  |  = Rp.  | 
|  Mandor  |    0.019  |  OH  |  x Rp.  |  = Rp.  | 
|   |   |   |  Jumlah 2  |  = Rp.  | 
|   |   |   |  Jumlah (1) + (2)  |  = Rp.  | 
|   |   |   |   |   | 
|   |   |   |   |   | 
 
 
 
 
 
 

 
 
 
 
 
 
 
 
0 komentar :